2012-01 – 2015-10
completed
Mechanical Engineering
, Pakistan
- Document_Study_011.jpg
2010-09 – 2012-10
completed
Physics
, Pakistan
- Document_Study_021.jpg
Photos are only visible to registered employers
Register here
Power Plant OperatorPakistan |
6 years experience |
Birthday:
Nationality:
Pakistani
52165915
2012-01 – 2015-10
completed
2010-09 – 2012-10
completed
2022-05 – Till now
Auxiliary and Equipments handled
• Belt conveyor inspection
• Weight bridge system inspection
• Sampling device As fired and As Received and online analyser
• Stacker Reclaimer
• Coal Crusher
• Screening
• Coal yard and ash yard inspection
• DCS operating
• Coal unloading ditch area inspection
• Rotary impeller feeder inspection
• Dust suppression fogging system
• Air compressors, iron Separators and water pumps inspection
JOB RESPONSIBILITIES
• Responsible of smooth & safe operation within technical limits and emergency handling of coal.
• Routine duty changeover of equipment.
• Troubleshooting of operational problems and initiate maintenance requests.
• Isolation against work permits.
• Before Startup of any belts conveyer coordinate with CCR operator.
• Monitoring of coal crusher bearings temperature timely.
• Familiarity with hazardous materials transportation regulations.
• During ash loading good communication with truck driver to avoid splashing ash.
• Perform operations of the stacker reclaimer and auxiliary equipment, to coordinate with heavy equipment operators during unloading and reclaiming operations
• Evaluates and implements strategies developed for the stacking, unloading, reclaiming and coal blending operations
• Performs preventive maintenance on the stacker reclaimers and its auxiliaries before and after operation
• Performs closing and opening of electrical breakers of the stacker reclaimer protective devices
• Daily inspection the ash area must be neat and clean.
Other profile data will become visible once you register
To register2019-02 – 2022-01
Auxiliary and Equipments handled
. Limestone conveying process
. Belt conveyor inspection
• Rotary Blower inspection
• Lubricant station
• vertical roller piller milling machine
• En Mess conveyor
• weight Belt scale
• Limestone yard inspection
• DCS operating
• limestone unloading ditch area inspection
• Vibratory feeders inspection
• Air case jet bag filter
• Iron Separators and water pumps inspection
JOB RESPONSIBILITIES
• Responsible of smooth & safe operation within technical limits and emergency handling of limestone
• Routine duty changeover of equipment.
• Troubleshooting of operational problems and initiate maintenance requests.
• Isolation against work permits.
• Before Startup of any belts conveyer coordinate with CCR operator.
2018-05 – 2018-07
Opening the screening and cleaning the nuts and bolts Opening the gate valve Cleaning it Fitting it with the help of chain block.
2017-02 – 2017-05
All types of valves NRV, RV, PSV, GATE VALVE, GLOB VALVE, BUTTERFLY VALVE Change gasket and replace valve. Clean the all nut and bolta clean with WD40.
Internship
2016-06-30 – 2017-07-31
Maintain the all equipments for practical work .issue the all tools for making projects maintain the All class attendance and worksheet. send data through online to Teveta head office.
Initial vocational education
2014-03-01 – 2014-08-31
2D,3D drawing
Internship
2014-06-24 – 2014-07-25
Assistant fitter
Initial vocational education
2013-04-01 – 2013-06-30
completed
Technical course
Other certificate
Certificate of examination in level A1
–
Communication, problem solving, leadership, time management, Team work, Management.