2012-06 – 2016-05
completed
Electrical Engineering
, India
- Document_Study_011.jpg
Photos are only visible to registered employers
Register here
Electrical Engineering ForemanIndia |
1 year experience |
Birthday:
Nationality:
Indian
39634397
2012-06 – 2016-05
completed
2017-11 – Till now
Successfully managed to Assist superior engineers
: Monitoring and valuation of control devices
: Calculating energy usage with different time period
: Studying working of different type of relay protection schemes
: Checking control wiring of different types of relays in control room.
Other profile data will become visible once you register
To register2017-03 – 2017-11
Successfully managed to Assist superior engineers and supervise workers in the following works
• Troubleshooting on electronic and electrical systems.
• Power equipment testing and commissioning of CVT, PT, CT, SA, GCB, etc.
• Testing of transformer oil using BDV kit and Water content test kit and HOC of Main and OLTC tank of transformers
• Replacing CVT, GCB, CT, SA, RVT in 400kV yard, reconnection of control cables.
• Shifting & reconnection of two 500KVA transformers, UG cable (XLPE) termination using heat shrinkable indoor kit, Cable
crimping, cable laying.
• Taking thermal images of yard equipments and Preparation of various office records including Estimates for operation &
Maintenance works.
Internship
2016-03-01 – 2016-03-05
Industrial Training includes maintenance and overall study of transformers and different types of meters.
–
–
–
: C,C++
: MAT LAB
: Windows Office Tools.
: Auto cad