2005-09 – 2011-05
completed
Architecture
, Egypt
- Document_Study_011.pdf
Photos are only visible to registered employers
Register here
Engineer - ArchitectureUnited Arab Emirates |
8 years experience |
Birthday:
Nationality:
Egyptian
44080165
2005-09 – 2011-05
completed
2016-11 – Till now
- Carry out routine inspections of works to ensure that the quality of workmanship meets the service level agreements.
- Ensure that all allocated work is performed to optimize productivity and quality of service.
- Coordinate with projects team and contractors to make sure that units are ready and match quality standard before handover.
- Inspect ready units along with the customer during home orientation in the final stage of handover including a detailed snagging and follow up with contractors and consultant.
- Assist customer with moving procedures, guide them and provide the assigned parking key and others.
- Handle all communications with customers by updating them on the project construction.
- Assist customers along with the maintenance and quality team in defect liability period.
Other profile data will become visible once you register
To register2015-12 – 2016-07
- Handling direct work executed on site by main contractor or sub-contractors and assist the construction manager in specific duties.
- Responsible for all day-to-day site activities.
- Take all necessary measures for an organized mobilization of site facilities.
- To facilitate and coordinate all the sub-contractors work.
- Responsible for the direct execution of the works in strict compliance to the contract specifications and requirements.
- Supervise the quality inspections and testing required by the quality procedures.
2015-01 – 2015-09
- In charge of planning, organizing and managing the construction team for the completion of project as scheduled.
- Responsible for the foremen and charge hands.
- Monitor the productivity, progress and quality of ongoing work.
- Plan the project execution, prepare detailed look ahead schedules based on project deadlines, in coordination with Construction Manager.
- Producing daily and weekly project progress report to Construction Manager.
- Managing subcontractors from initiation to closeout, ensuring the work progress is as per the approved schedule.
- Ensuring the implementation of Project HSE program and safe work practices in the project.
- Responsible for leading, motivating, training and developing construction team.
2013-12 – 2014-12
- Study contract documents including drawings, specifications to prepare quotation request for architectural work.
- Preparing comparative statements.
- Able to contact suppliers and subcontractors and review their offers using references and historical data.
- Prepare and submit material requests according to contract conditions for projects and follow up approvals.
- Update material and contract report on a weekly basis.
2013-03 – 2013-12
- Create 3D models based upon sketches from the director or drawings supplied by other consultants.
- Develop plans, sections, elevations and details cut from a 3D model for medium to large scale projects.
- Clearly annotate, dimension and detail production drawings in conformance to OLC standards and practices.
- Producing structural and architectural shop drawings based on BIM models.
- Plot drawings to pdf, dwg to paper plots from large projects.
- Create 3D visuals or renders on an as-needed basis for marketing or project use.
- Coordinate the expansion of existing Revit content and detail libraries.
2012-01 – 2013-03
- Reviewing Material submittals, method statement, shop drawings and RFI.
- Supervising the construction works of projects in accordance with the Contract Specification and Drawings including issuing site instructions and NCR.
- Conducting progress meetings & technical meetings with Contractor & Sub- Contractors.
- Handling all changes as instructed by the Client and liaising with the concerned parties for required implementation.
- Monitoring the Master Program and tracking critical paths and milestones.
- Review the corrective actions proposed by the contractor, respond / follow ups and close out procedure.
- Assist the discipline staff in the review of submittals, specialized on-site / off-site inspections, testing and commissioning, including shop drawings, materials and alternative proposals submitted by contractors.
Further training
2018-07-20 – 2018-08-10
completed
Further training
2009-07-21 – 2009-10-27
–
Other certificate
Certificate of examination in level A1
Construction Drawings
Design Research
Sustainable Design
Interior Design
Project Management
Rendering
Project Planning
Residential Design
Procurement
Animation
Design
Construction
Project Estimation
Contract Management
Architecture
Sketching
Construction Management
Interior Architecture
Concept Design
Structural Engineering
Design Management
Surveying
Building Materials
Drawing
Project Engineering
BIM
CAD
Engineering
Architectural Drawings
Submittals
Architectural Design
AutoCAD
Revit
SketchUp
AutoCAD Architecture
Photoshop
3D Studio Max
Microsoft Office
Adobe Photoshop
Vray
Microsoft Excel
Negotiation
Contract Negotiation
Architectural Modeling
Shop Drawings
Decoration
Handover
Tender Packages
Project Co-ordination
Fit-out