2006-05 – 2008-04
completed
General and Comparative Cultural Studies
, Pakistan
- Major: GENERAL ARTS
GRADUATION IN ARTS
- Document_Study_021.jpg
2000-09 – 2003-08
completed
Chemical Engineering
, Pakistan
- Document_Study_011.JPG
Photos are only visible to registered employers
Register here
Depth Drilling Specialist (Petroleum and Natural Gas Extraction)Pakistan |
15-20 years experience |
Birthday:
Nationality:
Pakistani
45146212
2006-05 – 2008-04
completed
GRADUATION IN ARTS
2000-09 – 2003-08
completed
2009-11 – Till now
PROFESSIONAL EXPERIENCE Total 16 YEARS
1. Dhabi Oil Refining company (TAKREER) Abu Dhabi
November 2009 To Date
Currently I am working at following units
Heavy Naphtha Hydro Treater 82 m3/Hr
Light Naphtha Hydro Treater 130 m3/Hr
Plateforming Unit 82 m3/Hr
CCR Unit 1000 Lb/Hr
Light Naphtha Isomerization 130 m3/Hr
Sulfur Recovery Unit 100 T/D
Fuel / Sour Gas treatment Unit 10000 Nm3/hr
Sour water Treatment Unit 50 m3/hr
Amine treatment Unit 100 m3/hr
2. Pak Arab Refinery Ltd. ( field/DCS operator)
March 2005 ~ to November 2009
NHT : having Hydrotreaters, Fractionation & H2S Stripper. 25400 BPD.
Platforming : Platformer, LPG Treating ,Hydrogen Treating 16350 BPD.
CCR : Continuous Catalyst Regeneration (CCR) 1000 LB/Hr
I work as a field/DCS operator and run the shift independently.
Other profile data will become visible once you register
To register2005-03 – 2009-11
Pak Arab Refinery Ltd. ( field/DCS operator)
March 2005 ~ to November 2009
NHT : having Hydrotreaters, Fractionation & H2S Stripper. 25400 BPD.
Platforming : Platformer, LPG Treating ,Hydrogen Treating 16350 BPD.
CCR : Continuous Catalyst Regeneration (CCR) 1000 LB/Hr
I work as a field/DCS operator and run the shift independently.
3. Olympia Chemicals Ltd. June 2003 ~ February 2005.
I have worked at Brine purification as a Process Plant Operator
I have worked at water purification and cooling water system
Other certificate
PROFESSIONAL EXPERIENCE Total 16 YEARS
1. Dhabi Oil Refining company (TAKREER) Abu Dhabi
November 2009 To Date
Currently I am working at following units
Heavy Naphtha Hydro Treater 82 m3/Hr
Light Naphtha Hydro Treater 130 m3/Hr
Plateforming Unit 82 m3/Hr
CCR Unit 1000 Lb/Hr
Light Naphtha Isomerization 130 m3/Hr
Sulfur Recovery Unit 100 T/D
Fuel / Sour Gas treatment Unit 10000 Nm3/hr
Sour water Treatment Unit 50 m3/hr
Amine treatment Unit 100 m3/hr
2. Pak Arab Refinery Ltd. ( field/DCS operator)
March 2005 ~ to November 2009
NHT : having Hydrotreaters, Fractionation & H2S Stripper. 25400 BPD.
Platforming : Platformer, LPG Treating ,Hydrogen Treating 16350 BPD.
CCR : Continuous Catalyst Regeneration (CCR) 1000 LB/Hr
I work as a field/DCS operator and run the shift independently.