2010-05 – Till now
• Detailed project report preparation.
• Leading the O&M/ Construction activities of 220/110/33//11KV Substation and 33/11KV outdoor substations.
• Preparation of estimate as per international standard and practices.
• Preparation of drawing as per statutory clearances for approval.
• Attending for Engineering / Technical & progress meeting with Main Contractor, Project Management team, Client & Consultant.
• Preparation of budgets
• Giving essential training and tips to new entrants so as to yield maximum output.
• Preparation of maintenance plan, shut down plans as per Central board of irrigation and power manual, shift duty cycle and monthly operating reports.
Other profile data will become visible once you register
To register2008-07 – 2010-04
• Planning manpower, assigning the tasks and executing the force to achieve objective.
• To develop, review and maintain standard operating procedures of equipments.
• Developed SAP codes for various spares using material master control system.
• Prepared schedule for maintenance of equipments.
• Raise awareness among staff about best safe practices.
• Coordinated with chemical, mechanical and instrumentation wings to prepare shutdown plan.
Further training
2018-01-09 – 2018-01-11
Training was about various Power Equipment Testing methods.
Further training
2016-11-29 – 2016-12-03
completed
Training was about RTU& SCADA HMI Configuration and installation.
Initial vocational education
2008-02-01 – 2008-04-30
completed
–
–
–
• Expert in trouble shooting in a Substation.
• Ability to work in pressing condition.
• Good leadership skills.
• Hardworking towards achieving goals & deadlines.
• Team player.
• Good attitude towards application of works.
• Ability to comprehend complex engineering problems.
• Ability to manage large scale technical projects.
• Prompt and effective action during breakdown of machineries.