09/2011 – 09/2013
abgeschlossen
Bauingenieurwesen
, Pakistan
Fotos sind nur für registrierte Arbeitgeber sichtbar
Hier registrieren
Techn. Assistent/in - BautechnikSaudi-Arabien |
10-15 Jahre Erfahrung |
Geburtsdatum:
Staatsangehörigkeit:
pakistanisch
25759124
09/2011 – 09/2013
abgeschlossen
10/2020 – Bis heute
• Assigned for the implementation supervision of different Trade foreman (Carpenter, mason, s/fixers) to ensure high productivity & work will be done according to the drawings & specification requirement, quality control with high quality standard of finishes & ensuring work order & standard are completed in a timely & cost effective manner, weekly progress report to the construction manager. Daily reviews site drawings. Follows instructions with construction manager & consultants.
• Checking the strict implementations of the details & diminishing in slab & pedestal, distances of rebar & stirrups according to the approved drawings prior to casting of concrete.
• Have knowledge of all highway tests on field for quality of highway.
• To ensure for removed forms are adequately cleared, maintained & stacked in for re-use as necessary.
Weitere Profildaten werden sichtbar, wenn Sie sich registrieren
Zur Registrierung04/2019 – 03/2020
• Supervision of Civil works, taking out Quantities, Quality Control of materials for use, Preparing Progress reports.
• Basic Knowledge about drawings reading & leading of manpower strength & solve the major problems on site.
• To ensure that all grade prepared & executed to the lines & levels necessary to achieve the correct concrete profiles.
• To ensure maintenance to correct formwork profiles, plumb etc. during & on after the concrete work.
• To ensure that all reinforcement in properly & securely fixed into position to prevent displacement during concrete work & to maintain proper concrete cover.
• To check that the formwork is clean, free from extraneous matter & the release agent has been correctly applied
12/2017 – 01/2019
• Complies with all statutory requirements connected with the implementation of project.
• Making Inspection Request (RFI / WIR) for each activity according to ITP.
• Inspecting the field activities such as excavation, Backfilling, foundation work, Piling work, sub structure & Super structure Civil Work, Bridges flyover or underpass, foundation retaining wall, water proofing, steel frame structure work, concrete pouring.
• To finish concrete surface as per standard requirements & arrange proper curing arrangements.
• Check the detailed survey & Lay-out of structures before the execution of construction activities.
12/2013 – 09/2017
• Finishing job activity a huge command such like, Aluminum & stone Cladding, Block masonry, Plaster, Title & paint Work, Door & Window (Metal, Aluminum, Wood) including Phenolic wall partition, Floor & Wall wooden Cabinet.
• Coordination with Civil testing agencies / batching plants for in time delivery of concrete, subsequent inspection & testing requirements. Ensuring the availability of QC Inspector during any operations.
• Complies with the highest level of safety during all stages of work to avoid any type of incidents or accidents. Take reasonable care of own health, safety & that of others in the workplace.
09/2008 – 04/2011
• Coordination with consultant & architectures. Satisfy client requirements according to their need. Coordinated all building materials requirements on sites.
• Confers with staff & worker to ensure production & personnel problems are resolved.
• Analyzes & resolves worker problem & recommends motivational plans.
• Examines & inspects work progress, equipment & construction sites to verify safety & ensure that specifications are met
05/2005 – 07/2007
I am well motivated to managing issue at site, well expert in progress as per site resources and condition, Expert in rebar cutting bending and fixing manually, Carpentry formwork erection, Mason job, Scaffolding erection,
I am Hard worker, Positive attitude, Self learner
Berufsausbildung
12.09.2001 – 12.09.2005
03 Years Diploma in Civil Technology .
–
–
–
–
I know the Site Construction process/Procedure in a professional way to avoid mistake, project mile stone, Cost Controlling, Progress wise, Safety and Quality manner.
I know how to get the target to avoid over casting, over budget. I know the skilled and unskilled manpower attitude and to treat them to get the progress in a tricky way.
I know the Quantity survey, Bar bending schedule, Invoices, AUTOCAD 2D, Construction management. I can do a survey at site, layout, cutting and bending at site or a main yard, Material receiving at site, Material storage and handling, Types of excavation with manually or Machinery, Types of Shoring with Procedure and methods.
I experts in Quality of Work, as per the international standards, Technical submittals, Project quality Plan, Inspection test plan, inspection Check List, Forms, Documentation , Filing Records, in Excel sheet, and hard copy. MS Office, PDF File converting, Exploring Engine, Etc