Berufserfahrung

Zeitraum
Tätigkeit / Unternehmen
Aufgaben

03/200902/2017

Lead Planning Engineer

, Vereinigte Arabische Emirate

Project Title: , , Mussafah
Description: The CCS Project involves capture, compression, and dehydration of wet CO2 to dense phase from the Emirates Steel Factory in and transportation to the reservoirs for the purpose of Enhanced Oil Recovery (EOR). The Project is conceived and is being managed by a Joint Venture between , the UAE’s company, and , a wholly-owned subsidiary of the Government-owned Mubadala Development Company. It involves construction and operation of the Project’s CO2 dehydration and compression facility located adjacent to the factory and subsequent transportation of the compressed CO2 to reservoirs, approximately 45 km / 28 miles southwest of City. This is a clean energy project, first of its kind in GCC, a part of current sustainability programme in UAE.
Projects completed: 2 & 3 Sulphur Recovery, Process and Power Generation, , UAE
Phase2 Fresh Water Transmission System, , UAE
Responsibilities:
• Responsible for preparation of:
o Procedures for planning & project control, project coordination, progress measurement and invoicing
o Baseline schedule (level-4) with budgeted man-hours in Primavera P6
o Engineering Document Deliverable Register (EDDR), Procurement Service Register (PSR) and Manufacturing & Delivery Document Register (MDDR) for Progress measurement
• Updating overall schedule, progress and cost S curve, project performance trend, man power histogram, critical path, CPI, SPI, look ahead schedule, etc.
• Attending weekly & monthly project review meeting with client
• Participating weekly schedule review meeting with senior management to analyse the schedule & project risk and critical path review
• Providing guidance to the planning engineers for preparing daily, weekly & monthly progress reports
• Setting progress target for discipline engineers in line with planne

  • Dokument_Praxis_011.pdf

02/200802/2009

Planning Engineer

, Vereinigte Arabische Emirate

Project Title: (Nabors, Ensign, WDI, and LTI
Responsibilities:
• Handled the preparation of baseline schedule resource loaded with man-hours and freeze the base line schedule
• Performed weekly and monthly update of the schedule with actual
• Drafted daily, weekly and monthly progress report, updated overall schedule, progress S curve, project performance trend man power histogram, critical path, CPI, SPI, 2 weeks look ahead, attend weekly progress meeting and monthly progress meeting with client

  • Dokument_Praxis_021.pdf

06/200501/2008

Planning Engineer

, Vereinigte Arabische Emirate

Projects Title:
Responsibilities:
• Responsible for preparation of baseline schedule resources with budgeted man-hours
• Accountable for monthly updating of the schedule
• Drafted daily progress report, weekly progress report and monthly progress report
• Updated overall schedule, progress S curve, project performance trend man power histogram, critical path, CPI, SPI, 2 weeks look ahead, and attend weekly progress meeting and monthly progress meeting with client

  • Dokument_Praxis_031.pdf

09/199706/2005

Planning Engineer

, Oman

Projects Title:
, Nimr T-4819 (15,000 M³) , Mussallim Phase I & II Field Expansion Project:
Roles: Project Coordinator, Planning Engineer, Construction Engineer

Responsibilities:
• Planned & scheduled jobs based on priority and resource availability
• Reviewed the daily work schedules monitor the progress of work against the planned V/s base line schedule
• Drafted weekly & monthly progress reports as per the contract requirement

  • Dokument_Praxis_041.pdf

Aus- und Weiterbildung

Zeitraum
Abschluss / Institut
Inhalt

Weiterbildung

06.11.201406.11.2014

Acumen Schedule Risk Analysis

, Vereinigte Arabische Emirate

Acumen Schedule Risk Analysis

Weiterbildung

04.11.201405.11.2014

Acumen Fuse & Acumen 360

, Vereinigte Arabische Emirate

Acumen Fuse & Acumen 360 Schedule validation

Weiterbildung

26.05.201330.05.2013

Primavera Risk Workshop

, Vereinigte Arabische Emirate

Primavera Risk Workshop

Weiterbildung

09.03.200812.03.2008

Primavera P6 Project Management Module

, Vereinigte Arabische Emirate

Primavera P6 Project Management Module from CMCS in 2008

Sprachkenntnisse

Sprache
Level
Prüfung / Zertifikat
Malayalam
Muttersprache

Hindi
Verhandlungssicher (C2)

Englisch
Fließend (C1)

Weitere Fähigkeiten

Kompetenzen
Führerscheine
Interessen, Hobbys, Persönliches

Experienced engineer with overall 25 years of experience in Projects, including 15 years in Project Planning, Scheduling, Coordination, Monitoring and Control.

• Proficient in preparing schedule of Project in Primavera P6 and procedures for planning & project control, coordination, progress measurement and Invoicing
• Skilled in Creating Engineering Document Deliverable Register (EDDR), Procurement Service Register (PSR) and Manufacturing & Delivery Document Register (MDDR) for Progress Measurement, Progress S Curve, Project Performance Trend, Man Power Histogram, Critical Path, CPI, SPI, 2 Weeks Look Ahead and Project Risk Register, Delay Analysis, Schedule & Project Risk Analysis and Critical Path Review
• Familiar with Primavera P3, Primavera Risk Analysis, Acumen Fuse Schedule, etc.
• Deft in administering project operations with key focus on top line & bottom line profitability by ensuring optimal utilization of resources
• Actively participated in the Project Proposal to ensure the Scope of Work is properly defined and ensures that the Project Team has a clear understanding of the Project Scope of supply
• Acquired certifications of Primavera P6, Primavera Risk, Acumen Fuse & Acumen 360 & Acumen Risk
• Holds the merit of handling various projects such as:
o , , Mussafah
o 2 & 3 Sulphur Recovery
o FWTS-2, 131kM, ø 64” Water Transmission Pipeline Project, , UAE
o (Nabors, Ensign, WDI, and LTI)
o
• A team player with excellent problem solving & analytical skills

  • Kraftrad