03/1985 – 06/1988
abgeschlossen
Elektrotechnik
, Indien
Electrical Machines,Transmission & Distribution,Engineering Drawing,Estimation & Coasting,
- Dokument_Studium_011.jpg
Fotos sind nur für registrierte Arbeitgeber sichtbar
Hier registrieren
Industriemeister/in - ElektrotechnikIndien |
mehr als 25 Jahre Erfahrung |
Geburtsdatum:
Staatsangehörigkeit:
indisch
41196720
03/1985 – 06/1988
abgeschlossen
Electrical Machines,Transmission & Distribution,Engineering Drawing,Estimation & Coasting,
02/2015 – Bis heute
Infrasructure development,Project control,Estimation,Maintenance
Weitere Profildaten werden sichtbar, wenn Sie sich registrieren
Zur Registrierung02/1991 – 06/2013
Design,Installation,Testing,Commissioning & Maintenance
Auslandsaufenthalt
22.01.2009 – 28.02.2015
Project Activity,Site Supervisor.
Teilnahme-Zertifikat auf Niveau C2
25 yrs. of experience in Plant Control-Electrical Engineering. Have immense knowledge in Machine operation / Installation /Testing & Commissioning ,trouble shooting,breakdown clearence supporting production target.Experienced in Electrical system for Plant ,design basics,data sheets, calculations of load using software packages like ETAP,EDSA,CYME for short circuit calculations and relay settings, electrical earthing. Experience in installation & maintenance of Electrical equipment’s, Experienced in 33/11KV project-(sub-station erection,backup generator installation & maintenance) Transco specification. Associated with 33/11kv Main Receiving Sub-station installation, distribution system and maintenance.
Presently working with Remya Electro-Gear as Infrastructure / Production -Manager.Responsible for infrastructure,Machine utility,Planning production.
Experienced in CT/ PT calculation and installation, relay (ABB),CB installation and maintenance ( Transco specification) ,strictly to FAT Package sub-station designing. Can perform advanced complex engineering assignments using convention or innovative engineering techniques and analyses. I am fully proficient in the utilization of standard engineering theories. I had assignments involving CAE (Computer aided engineering) /CAD (Computer aided design) applications. Familiar with PLC SCADA system.
I am responsible for implementing the project quality plan and quality procedures and productivity related to all electrical works in accordance with the program of work on construction sites. Project includes technical queries,purchasing materials,vendor drawing review,cable sizing,cable routing,Electrical installation,earthing layouts for centralized most sophisticated workshop, High rise building. Complete MEP activity. Assisted in defining the process for execution of engineering activities related to all types of electrical systems.