07/2009 – 04/2013
abgeschlossen
Elektrotechnik
, Indien
- Dokument_Studium_011.jpg
Fotos sind nur für registrierte Arbeitgeber sichtbar
Hier registrieren
Projektingenieur/inIndien |
3 Jahre Erfahrung |
Geburtsdatum:
Staatsangehörigkeit:
indisch
55131222
07/2009 – 04/2013
abgeschlossen
03/2015 – 05/2017
Interaction between Client, Sub-Contractor and Design Team.
To execute the following erection work
380kV, 3150A GIS ( Make : ALSTOM)comprising of 36Nos. circuitbreakers102Nos.
disconnector switches and 114Nos Earth switches in one and half breaker configuration.
230kV, 3150A GIS ( Make : ALSTOM) comprising of 54 Nos. circuit breakers, 150Nos.
disconnector switches and 165Nos Earth switches in one and half breaker configuration.
Two(2)Nos. 380kV/230kV, 452/602/752MVA Auto Transformer – Make ALSTOM
Two(2) Nos.13.8kV Grounding Transformers ( Make : HHI)
Two(2) Nos. 2500kVA, 13.8kV, 400-230V Station service Transformers, STC, KSA
Two(2) Nos.13.8kV, 630A indoor metal clad Switchgears with SF6– Make Al-Fanar
230kV Single core 2500sq.mm copper XLPE cables 2 run per phase
15kV Power Cable 185sq.mm copper XLPE
LV Power Cabling, control Cabling
Lighting, Grounding & Lightening system
Substation Automation System ( SAS ) – Make ABB
Control & Protection, DFR, F/O communication System
AC/DC Auxiliary Power Supply System with Battery Bank & Battery charger
380kV and 230kV Take-off Structures
HVAC & Plumbing System
Fire Protection – Fire Alarm. FM-200, Fire Suppression System & Fire Hydrant System.
Weitere Profildaten werden sichtbar, wenn Sie sich registrieren
Zur Registrierung10/2013 – 10/2014
Execution, supervision and inspection of Electrical related works.
Monitor & ensure progress of works are carried out according to design specification,
quality plan & safety standard and to report any discrepancy.
Raising and resolving any non-conformance reports.
Stage wise inspection and its documentations.
To check whether all works, materials are in accordance with drawing & specification.
Ensure that all inspections are performed in accordance with the project requirement,
specification, acceptance criteria and international standards. Submission of all final reports.
Weiterbildung
15.05.2016 – 26.05.2016
abgeschlossen
Weiterbildung
05.11.2014 – 05.01.2015
abgeschlossen
–
–
–
–
Autocad 2D/Electrical CADD.
MS Office.
operating system installation.
Assembling of PC, Basic knowledge of Networking & Troubleshooting PC.