03/1999 – 08/2006
abgeschlossen
Maschinenbau
, Chile
- Dokument_Studium_011.pdf
Fotos sind nur für registrierte Arbeitgeber sichtbar
Hier registrieren
Ingenieur/in - MaschinenbauMexiko |
10-15 Jahre Erfahrung |
Geburtsdatum:
Staatsangehörigkeit:
chilenisch
26131575
03/1999 – 08/2006
abgeschlossen
03/2017 – Bis heute
Prepare detailed drilling and completions planning for Offshore wells in in southeast marine region in Mexico. Simulate torque and drag modeling, well planning, and casing design with Landmark suite.
Weitere Profildaten werden sichtbar, wenn Sie sich registrieren
Zur Registrierung08/2016 – 09/2016
Worked as Drilling Consultant for the joint venture of and project. Prepared the horizontal well design, rig sizing, BHA design, casing design, time and AFE estimation. This design was presented to General Manager.
04/2012 – 10/2015
Key Responsibilities and Accountabilities:
Prepared detailed drilling procedures and contingency plans for horizontal wells in Tertiary and Mesozoic formations.
Led, mentored and coached a team of 7 drilling engineers of the wells planning team.
Prepared AFE cost estimates and qualify contractors and services providers.
Key Achievements:
Assessed and implemented the use of turbines and hybrid bits to drill hard cretaceous carbonates with chert content, reducing drilling time in 13 days savings of 580 KUSD per well; paper presented at the Drilling Conference in .
Designed the relief wells for the Terra 123 blowout. presented at the Drilling Conference and Exhibition in .
Participated preparing the technical and commercial documents of the Pemex tender to renegotiate the contracts in the south region, SLB awarded with a contract value of 1.3 billion USD.
Received the IPM Pro Award from the IPM President in December 2013 recognizing my exceptional contribution above and beyond of what is normally expected.
08/2010 – 03/2012
Key Responsibilities and Accountabilities:
Developed well drilling and completions statistical time analysis with crystal ball, cost estimates, P&Ls, and integrated results into economic models to evaluate project opportunities.
Participated in the technical and commercial bid evaluations for drilling services and present peer reviews to headquarters.
Prepared technical scopes of work for all drilling support services tenders.
Key Achievements:
Successful preparation of Shell unconventional horizontal Wells tender in Argentina, selected Perform by Gold Winner in 2013; the project has contributed more than $100 million in revenue in 2013.
Recognition from Production Management VP of Operations for Carrizo E&P Contract Award.
12/2006 – 07/2010
Drilling and completion of gas wells in the Burgos basin, re-entry project in Russia, drilling gas wells in Oman and exploratory wells in Chile.
Key Responsibilities and Accountabilities:
Worked at the rig site as drilling engineer.
Prepared the daily drilling report, and supervise operations such as whipstock setting, directional drilling, trips out of the hole, Tough-logging operations, and casing running and cementing.
Key Achievements:
Redesigned the casing seat points in the Arcabuz field to avoid mud losses, saving 84KUSD per well to .
Weiterbildung
11.06.2012 – 15.06.2012
Project management course based on PMI methodology
Weiterbildung
01.03.2011 – 01.11.2011
abgeschlossen
Quantitative risk analysis with crystal ball.
Weiterbildung
01.04.2011 – 15.04.2011
Sales training for employees working in business development.
Weiterbildung
02.03.2009 – 06.03.2009
Project management course based on PMI topics.
Auslandsaufenthalt
01.08.2004 – 31.08.2005
DAAD scholarship in Mechanical Engineering
Co-Autor / Mitverfasser
27.10.2015
Autor / Verfasser
17.03.2015
Autor / Verfasser
04.03.2014
Anderes Zertifikat
Prüfungs-Zertifikat auf Niveau C1
–
Project management, business development, mechanical engineering, energy engineering, oil and gas engineering, drilling and completion engineering.