industrial electrician

, Chile

RDG Electrical Engineering (Puerto Montt) 2012 - 2019
-Calculation, electrical project cubicles for warehouses, process plants, refrigerators (NH3 / ammonia pumping systems), Continuous freezing tunnels. Low voltage electrical design, calculation memories, capacitor banks, electrical drawings in autocad.
Calculation of projects using Schneider Electric software-ecodial. Construction of force and control cabinets. -Installation network lighting, audio and video, platform level under stage. - Theater of the Lake (Frutillar)

MICROAUTOMACION 2011
- Design and programming of automatic control for solid waste disposal system through vacuum lines (2 cyclone ponds-7 waste suction lines). Implemented using Mitsubishi FX series PLC, HMI Got GT1150. Use of Mitsubishi Gx-Developer, GT-Designer software.
This solid waste disposal system was installed at the Novaustral-Porvenir salmon plant (Tierra del Fuego)


CHILEFOOD AUSTRAL S.A. (Puerto Montt) 2003-2008
- Design controls for process machines closing jar, washing machine, palletizer.
- Control system Chlorination-Dechlorination plant riles, implemented using Mitsubishi FX PLC, time control, pond levels, evacuation pumps


CONSERVAS Y CONGELADOS / COCOSA 2003
- Design and implementation of automatic control, for canning sterilizer autoclave by direct injection of saturated steam. Time, temperature and pressure control. Project executed according to FDA regulations, for the export of canned goods to the US. Record of temperatures, sterilization and cooling times. Control system implemented with mitubishi fx PLC.

02/201811/2018

electrical project

, Chile

Advisor of the patagon explorer yacht electrical project.
Review of the electrical system design of the yacht, cubing, quotation-purchase of materials.
-Dimensioning of conductors and protections, selectivity, ladder-driver, anchoring systems and equipment supports, junction boxes.

-Process of the control and acceleration system of the Cummins QSL9-M 330HP/1800RPM main engines, from 2 bridge and flybridge stations, electronic acceleration system (ETS). Equipment connected to NMEA2000 bus

-Electrical design, selection of flexible solar panels, MPPT charge controllers, connectors, diodes, protections, support and mounting elements to install the solar flybridge alero panels

- Disruptive and selective interruption of the battery bank 24VDC / 2000Ah (12 Opzv gel batteries victronenergy 2v / 2000Ah) location, connection + charging system and safety elements. 2 high performance marine alternators with multistage regulator and electronic controls for the operation of the 2 alternators in parallel, providing a balanced charging current to the battery bank.

-circuits. Drive for: fire pump, bilges and fuel purification system pump, measurements of tank levels (fuels, fresh water, gray and black water).
-circuits. lighting (exterior, inside), push buttons, dimmer.
- Design of electrical cabinets, protection and control equipment, 220VAC and 12 / 24VDC.

06/201701/2018

naval electrician

, Chile

- Repair-maintenance of HDPE welding machines, extruder, thermo-fusion and electro-fusion welding machines. (This company builds boats, fish cages, emissaries made of HDPE material),
Electrical installation and communication equipment on boats (pumps, lights, fuel tank level controls, windshield wipers), VHF radio, depth and temperature transducer, GPSmap plotter, radar antenna, automatic identification system (AIS)

02/201611/2016

industrial electrician

, Chile

Maintenance Supervisor Continuous process line.
-Adjustment and maintenance of multi-head weigher –Mbp C2, 14 weighing baskets, program configuration backup and calibration.
-Maintenance (2000 hours of operation) MULTIVAC R-535 vacuum thermoforming-sealing machine, o-ring replacements and springs in pneumatic directional valve assemblies, replacement of knives, dampers, adjusting bushings (transverse and longitudinal cutting station), oil-filters in vacuum pumps, brake discs (unwinders), maintenance of sealing and thermoforming lasts, safety system review, program backup.
- Maintenance of 2 IQF freezing tunnels (LSD3018-Yantai Moon), 2000Kg / Hr double drum spiral freezers, replacement of gearmotors, inductive detectors.

11/201201/2014

Software specialist

, Chile

- Software specialist - remote control of Hammer breakers. Commissioning, electrical connections in force and control cabinets, video cameras, traffic lights.
- Programming of the scada system using GE Cimplicity software, PLC programming (Versa pro software) - remote hammer operation - emerald mine production and northern reserves.
- Configuration IP video cameras. Installation of medium converter equipment, fiber optic headers, patch panel, fiber optic fusion, reflectometry tests
- Armed communications room rack. Drawings of electrical plans in autocad

01/200206/2007

industrial and naval electrician

, Chile

GENERAL EXPORTS CONSERVATION / CONSERVAS NOLY (P. Montt) 2003-2007
- Design, implementation automatic control for continuous cooker (saturated steam) capacity 7500 Kg / Hr.
- Repairs control systems canning machines for canning jars
- Design, implementation of electric drive, start-up, alarms and transfer-generator 750KVA
- Design of electric drives by means of a soft starter, for 75HP seawater pumps
- Installation of capacitor bank reactive power of 335KVAR


ASENAV - Bitter Ing. (Valdivia)
- Programming and implementation of alarm, control and monitoring systems (SCADA) for ships, projects executed according to the requirements of the Lloyds Register of Shipping and American Bureau of Shipping classification societies,
Development of supervisor program using Siemens step-7, ProTool / Pro software.

- Cruise ship "MARE AUSTRALIS"
- NELTUME tugboat (Ultratug)
- RIÑIHUE Tugboat (Ultratug)
- PIONERO roll on-roll off ferry barge (Austral Broom)
- Implementation of electric drives by means of a soft starter for cooling and lubrication pumps of 4 MAK 9M20, 2300 HP c / u diesel engines (NELTUME and RIÑIHUE - Ultratug tugs).

Sprachkenntnisse

Sprache
Level
Prüfung / Zertifikat
Englisch
Grundkenntnisse (A1)

Spanisch
Muttersprache

Weitere Fähigkeiten

Kompetenzen
Führerscheine
Interessen, Hobbys, Persönliches

use of applications / programs: Autocad, Ecodial Advance Calculation (Schneider electric), Step7 (Siemens), Cimplicity / versa Pro (General electric), Mitsubishi Gx-Developer / Designer

  • PKW

So geht's