06/2010 – 05/2014
abgeschlossen
Elektrotechnik
, Indien
- Dokument_Studium_011.pdf
- Dokument_Studium_012.pdf
Fotos sind nur für registrierte Arbeitgeber sichtbar
Hier registrieren
Ingenieur/in - Informations-, KommunikationstechnikIndien |
3 Jahre Erfahrung |
Geburtsdatum:
Staatsangehörigkeit:
indisch
13210982
06/2010 – 05/2014
abgeschlossen
02/2016 – Bis heute
Identifying poor coverage and quality patches, interference problems, handover failures, cell drags, neighbour relations, call drops, over shooting cells, swap issues and making action plan to resolve the same
Do the physical optimization of the site, providing proper azimuth, tilt and height according to clutter and nearby sites. Solving overshooting issues by tilting, height reduction and azimuth changes. Solving sector swap and cable swap issues.
Weekly reports on complaints & co-ordination of RF drive test engineers.
Action plan for Signal Strength verification, Coverage Checkup at remote and corporative locations.
Providing technical support for the DT Engineers in drive testing & resolving issues.
Coordinating with RF optimization (RNO) team for improving network performance.
Coordinating with customer in resolving issues related to coverage.
Analyzing DT report & taking necessary actions to resolve the issues.
Conducting IBS Coverage testing and taking necessary actions to resolve the issues.
Conducting SCVT Coverage testing, ATP 11A,ATP 11B,RFC,RFI testing and taking necessary actions to resolve the issues if any.
RDU and Small Cell Configurations
Weitere Profildaten werden sichtbar, wenn Sie sich registrieren
Zur Registrierung03/2015 – 02/2016
BSS (BSC & BTS) and RAN (RNC, NodeB) operation & maintenance activities.
Working with 2G, 3G BTS & BSC.
Maintaining & reconfiguring Abis, & A interfaces as per requirement.
Maintaining IuB, IuCS, IuPS links for RNCs & media redundancy.
BSC /RNC, BTS/NodeB & OSS server (M2000) software up-gradation.
Alarm monitoring and escalation in Huawie-M2000 of BTS and BSC ends.
Troubleshooting and fault analysis of BTS (GSM ) and NodeB sites.
Providing technical support for the Field Maintenance Engineers in resolving issues & alarms.
Coordinating with RF optimization (RNO) team for improving network performance.
Changing RF parameters, adjacent cell/neighbor redefinition & frequency plan implementation in Coordinating with RF planning (RNP) team.
All type of configurations in BTS, NodeB, BSC & RNC. Eg:Site Addition,Sector Addition,TRX addition to the sectors of BTS based on radio utilization & E1 feasibility,NE License Reconfiguration based on utilization.
Taking backups in BSC/RNC and M2000 and Routine Health Checkups in BSC & RNC.
Coordinating with customer in resolving issues related to BSS end.
06/2014 – 02/2015
Scheduling day today work chart for field Technicians,Monitoring & coordinating the activities of field Technicians.
Coordinating with customers in resolving issues within time.
–
–
RF Drive Testing Tools: XCAL Drive Testing, SITE FORGE and NET VELOCITY Drive Testing
Telecom Equipment's Exposure : BSC6900 GSM, BSC6900 WCDMA, BTS3900 GSM, BTS3900 A GSM, DBS3900 GSM &
BTS3900 A WCDMA , Enb of samsung and LTE small Cell of Airspan
OMCR : 2G, 3G of HUAWIE
RF Optimizing Tools : Xcal-Vuze, JCP,Net Velocity
Operating system: windows 10,windows 8 and windows 7
Software packages: XCAL,NET VELOCITY,SITE FORGE,HUAWEI - M2000, HUAWEI – M3000, Local Maintenance
Terminal(LMT) & RNC Web LMT, Google Earth , MS Office,and MS Office Excel.