03/1992 – 07/1998
abgeschlossen
Maschinenbau
, Chile
- Dokument_Studium_011.pdf
- Dokument_Studium_012.pdf
Fotos sind nur für registrierte Arbeitgeber sichtbar
Hier registrieren
Ingenieur/in - MaschinenbauChile |
10-15 Jahre Erfahrung |
Geburtsdatum:
Staatsangehörigkeit:
chilenisch
59006459
03/1992 – 07/1998
abgeschlossen
09/2013 – Bis heute
Design of touristic centre in the mountains, 400 km far from the Capital of country. Responsible of design of construction, design of Sanitary project, Permissions managing, Maintenance of everything in the centre, Using of ERNC, Working with clients, marketing, webpage, Contracts with big chilean institutions.
Weitere Profildaten werden sichtbar, wenn Sie sich registrieren
Zur Registrierung06/2015 – 05/2017
Designing of maintenance strategy for all equipment's EWS Project (3,5MM USD). All equipment for the biggest Desalinated Water Plant of the south cone.
06/2010 – 08/2013
Design of maintenance plans for mining equipment for very huge projects (Proyecto Mina Chuquicamata Subterránea, Proyecto Mina Ministro Hales, Proyecto RT II, Proyecto TADA, Planta de Tostación, Plantas de ácidos, and others minor projects ). Also, during this position, checked permanently the engineering drawings made for the Engineering Company.
05/2009 – 05/2010
Training of executives and workers in maintenance of Oil plants. Implementation of managing system for stock managing of hydrocarbons, level of inventory, EOQ, and daily practice reccomended.
11/2007 – 04/2009
Design of maintenance plans for mining equipment (Extraction Trucks). Improvement of existent maintenance plans. Confection of data sheets for massive charge of data in module PM.
02/2005 – 11/2007
Improvement of maintenance plans of underground mining equipment, Design of maintenance plans for new equipment. Also, monitoring and report of condition of oil for LHD Fleet. The most of time, study and improvement of KPI's for Jumbo drills. Study of optimal amount of cranes for lifting equipments during maintenance (using queue theory).
Weiterbildung
19.11.2007 – 22.11.2007
abgeschlossen
Using of AWB for managing Plant availability simulation
Weiterbildung
19.11.2007 – 22.11.2007
abgeschlossen
Use of AWB for Managing Reliability Centred Maintenance.
Weiterbildung
19.11.2007 – 22.11.2007
Lifecycle Costs Calculations
Weiterbildung
02.08.2006 – 03.08.2006
abgeschlossen
Using of advanced Excel
–
–
–
Maintenance, Reliability, Logistic, Maintainability of Projects.