2013-12 – 2018-01
Project Management & Engineering
, India
2002-08 – 2006-04
completed
Electrical Engineering
, India
Photos are only visible to registered employers
Register here
Engineer - ElectrotechnologyIndia |
10-15 years experience |
Birthday:
Nationality:
Indian
46508277
2013-12 – 2018-01
2002-08 – 2006-04
completed
2015-08 – Till now
Project Management{Project related with the Installation, Testing and commissioning of Solar Plants(Grid-Tie System and Off-Grid Systems), Installation and commissioning of solar Street Lights, Installation and Commissioning of Solid waste Incinerators) Preparation of Proposals, Viability Reports, Quotations, Invoices, Office and Sales Administration etc also MANAGEMENT, SUPERVISION, DESIGNING, INSTALLATION, TESTING & COMMISSIONING OF VARIOUS PROJECTS RELATED WITH THE INSTALLATION OF SOLAR PV {Rooftop Systems} SYSTEMS FROM 2 KW UP TO 300 KW(ON-GRID AND OFF-GRID SYSTEM). INSTALLATION OF 100LPD TO 10000LPD SOLAR WATER HEATERS ETC
ATTENDEE OF INTERSOLAR 2017, MUMBAI
Other profile data will become visible once you register
To register2011-10 – 2015-07
Project: Construction, Completion & Maintenance of
Installation, Testing & Commissioning of Electrical Services (also ELV) like
CO(Carbon Mono-Oxide),
Façade Lighting,
BMS(Building Management),
CCTV,
Audio Visual,
Access Control,
Telephone & Data,
Lighting,
SMATV,
Power,
Lighting Control,
FM 200,
Fire Curtain,
Form System,
Public Address,
Fire Alarm,
Central Battery,
Water Feature System,
Entry Management System.
And Supervision, Site co-ordination of all installations, quality analysis and inspection of all installations done by the subcontractors.
2010-09 – 2011-08
Project: REPLACEING CGTC at EAST/ WEST PIPELINE PUMPSTATIONS in
• Design, implement, maintain and improve electrical instrument, equipment, facilities for commercial, industrial and domestic purposes.
• Direct and coordinate manufacturing, construction, installation, maintenance, support, documentation, and testing activities to ensure compliance with specifications, codes and customer requirements.
• Perform detailed calculations to compute and establish manufacturing, construction, and installation standards and specifications.
• Inspect completed installations and observe operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.
• Oversee project production efforts to ensure projects are completed satisfactorily, on time and within budget.
• Prepare and study technical drawings, specification of electrical systems to ensure that installation and operation conform to standards and customer requirements.
• Supervise and train project team members as necessary.
• Prepare specifications for purchase of materials and equipment.
• Investigate customer or public complaints, determine nature and extent of problem, and recommend remedial measures.
• Investigate and test vendors and competitors product.
• Direct coordinate with engineer, customer and others to discuss the existing or potential engineering projects.
• Taking the permits for the required job (Cold, Hot, Confined space entry and Release).
2006-05 – 2010-07
JOB PROFILE IN
Worked as Assistant Engineer in 110KV Substation, KALOOR. 110KV Substation, EDAPPALLY. 66KV GAS INSULATED SWITCH GEAR (G.I.S) Substation, MARINE-DRIVE, 66 KV Substation, NARAKKAL FROM MAY 2006 TO JULY 2010
Substation Maintenance and Monitoring
Substation load is feeding from two 110KV feeders and ten 11KV-outgoing feeders do station load distribution.
Maintenance of 25 MVA, 12.5 MVA, 10MVA, 8 MVA 110/66 KV, 110/11KV 66/11 KV, Transformers
Periodically checking oil level, dielectric test of oil regularly
Annual maintenance of core and winding of transformers (Meggering, Insulation Testing etc.)
Maintenance of various types of Circuit Breakers (rating 125KV 1600A, 12.5KV 1250A/400A) of Siemens, BHEL, ARIVA, ALSTOM, CROMPTON GREEVES etc…
Maintainance of closing and tripping mechanism of Breakers.
Maintainance of CTs and PTs, it involves
Checking of ct, pt ratio setting
Insulation testing of bushing insulators and dust removal insulator discs.
Maintainance of Various types of Relays checking of trip circuits (Differential Protection relay, distance Protection relay, auxiliary relay, supervision relay, over current relay, Earth fault relay etc.)
Maintainance of 110V DC Battery Charger and A Battery Bank of 55 cells of 200Ah
Daily checking of voltage and specific gravity of each cell after turning off the Charger for 1 hr., whether it is in the specified limit.
Further training
2015-09-11 – 2016-04-15
completed
Further training
2009-08-10 – 2010-09-15
completed
Other certificate
–
–
–
–
Project Management Skills, Team Leader, Team Player, Leadership skills, Courage, Brave, Intelligent, Very Hard working, Dedicated , Loyal, Quick Learner, Excellent Troubleshooting Skills etc